Projects

Our work
in Dubai

A selection of recent shoring, piling and excavation projects for developers and contractors across Dubai, from Dubai Hills to Jebel Ali.

Selected projects

What we have built

A selection of the shoring and piling projects we have delivered over the last 10 months. It is an extract of our work, not a complete list.

H-beam & secant pile shoring, excavation – Dubai Hills, DubaiH-beam & secant pile shoring, excavation

Dubai Hills

Two residential plots with combined H-beam and secant pile shoring, followed by bulk excavation.

Client: Isto Development
Consultant: Madinat Engineering

H-beam shoring, excavation & dewatering – Wadi Al Safa 3, DubaiH-beam shoring, excavation & dewatering

Wadi Al Safa 3

H-beam shoring with excavation and dewatering for a basement residential building.

Client: SCC Vertex Development
Consultant: KWEC

Strut installation & rectification – Dubai Hills – remedial shoring, DubaiStrut installation & rectification

Dubai Hills – remedial shoring

Took over from a previous shoring contractor: installed struts and rectified the secant piles and concrete panels.

Client: Designsmith
Consultant: Madinat Engineering

H-beam & secant pile shoring – Jebel Ali – Labour Camp, DubaiH-beam & secant pile shoring

Jebel Ali – Labour Camp

H-beam and secant pile shoring for a labour accommodation project in Jebel Ali.

Client: Pepco Group of Engineering
Consultant: Al Hadara Engineering

Sheet pile shoring – Mustaqbal Road, DubaiSheet pile shoring

Mustaqbal Road

Supply and installation of steel sheet pile shoring along Mustaqbal Road.

Client: Wade Adams
Consultant: CDM Smith

Sheet pile & H-beam shoring – Wadi Al Safa – sheet pile & H-beam, DubaiSheet pile & H-beam shoring

Wadi Al Safa – sheet pile & H-beam

Combined sheet pile and H-beam shoring with precast panels, drilled with a rotary rig on site.

Client: Drake & Scull
Consultant: Eng. Adnan Safanini

Lift pit shoring & excavation – Lakeview 2 – Lift Pit, DubaiLift pit shoring & excavation

Lakeview 2 – Lift Pit

H-beam shoring with precast panels and excavation for a lift pit, ready for the pile caps.

Client: Samana Developers
Consultant: Italtech

Recent projects

Project overview

An extract of our recent projects. Ask us for references on similar work to yours.

ProjectClientConsultantSystemStatus
Dubai HillsIsto DevelopmentMadinat EngineeringH-beam & secant pile shoring, excavationCompleted
Wadi Al Safa 3SCC Vertex DevelopmentKWECH-beam shoring, excavation & dewateringCompleted
Damac HillsPrivate clientMadinat EngineeringH-beam & secant pile shoring, excavationCompleted
Dubai Hills – remedial shoringDesignsmithMadinat EngineeringStrut installation & rectificationCompleted
Jebel Ali – Labour CampPepco Group of EngineeringAl Hadara EngineeringH-beam & secant pile shoringCompleted
Mustaqbal RoadWade AdamsCDM SmithSheet pile shoringCompleted
Wadi Al Safa – sheet pile & H-beamDrake & ScullEng. Adnan SafaniniSheet pile & H-beam shoringCompleted
Lakeview 2 – Lift PitSamana DevelopersItaltechLift pit shoring & excavationCompleted
Water tank shoringAdam Banks3rd Column EngineeringH-beam shoring for water tankCompleted
La MerIsto DevelopmentMadinat EngineeringExcavation worksCompleted
Piling worksNYX Real Estate LLCModular ConsultancyPilingIn progress
Samana SkyviewsSamana DevelopersItaltechPit shoringUpcoming
MirdifStree ContractingDesign Theory Architectural Eng.H-beam & secant pile shoringUpcoming
Request a quote

Let's price your project

Attach your drawings and we'll come back with a solution and a quotation. Prefer to talk? Call or WhatsApp us directly.

Citibank Building, 12th Floor, Office 41, Dubai Healthcare City, Dubai
Services needed (select one or more)