Our
services
Shoring, piling, excavation, dewatering and ground works – one contractor from the first pile to a safe, dry pit.
Shoring & piling
The systems we design and install. Read more on shoring works and piling works.
Soldier Pile / H-Beam Shoring
Steel H-beams with precast concrete lagging panels. Fast, economical and our most installed system.
Secant Pile Wall
Interlocking concrete piles forming a stiff, near-watertight wall for deep basements and high groundwater.
Sheet Pile Shoring
Interlocking steel sheet piles for soft soil, water and coastal sites.
Bored Cast-in-Situ Piles
Bored piles from 500 to 2600 mm diameter and up to 72 m deep, with pile testing.
Excavation, dewatering
& ground works
Excavation Works
Open and controlled excavation, planned together with the shoring system and site logistics.
Dewatering Works
Groundwater control that keeps excavation and foundation work dry and on schedule.
Soil Improvement
Vibro compaction, stone columns and rigid inclusions that make weak ground ready to build on.
Ground Engineering Works
Grouting and soil nailing to seal and strengthen ground and stabilise slopes and excavations.
Anchoring
Ground anchors and tie-backs that hold the shoring wall back, so the pit stays open without internal struts.
Let's price your project
Attach your drawings and we'll come back with a solution and a quotation. Prefer to talk? Call or WhatsApp us directly.
Citibank Building, 12th Floor, Office 41, Dubai Healthcare City, Dubai