Dewatering works
Efficient dewatering keeps ground conditions safe and stable during excavation and foundation works. Whether for casting slabs, building substructures or preventing water ingress below ground, dewatering keeps the work area dry. At XPS, we assess the conditions of each project and install the most suitable system for groundwater control, always in compliance with local discharge regulations.
We use two proven methods, chosen by site depth, soil permeability and groundwater level.
Wellpoint dewatering
Ideal for shallow excavations in sandy or silty soil. A series of small-diameter wellpoints is connected to a header pipe and a vacuum pump, lowering the groundwater around the excavation. Quick to install and adaptable to tight spaces, it suits trenches, pipelines, foundations and utility works.
- Excavation depths up to 4–5 m
- Sandy or mixed soils
- Short-term groundwater control
Deep well dewatering
For deeper excavations or where large volumes of groundwater must be removed. Vertical wells with submersible pumps are drilled around the excavation and discharge continuously to approved locations. More powerful and consistent, suitable for large projects or soils with lower permeability.
- Excavation depths beyond 5 m
- Large sites and high inflow
Questions about dewatering works
How long does dewatering run?
Usually until the basement is built and heavy enough to resist uplift. We plan the duration with the main contractor's programme.
Do you arrange discharge permits?
We prepare the system to meet the authority requirements and support the application process.